• Acciona Experience
    • Home
    • Transport
  • Renewable energy
  • Transport
  • Water
  • Social
  • Cities
  • Sustainability
  • Innovation
  • contact
  • Legacy Way: the tunnel of time

    • Transport
    ACCIONA built an underground bypass in Brisbane that has given every user an extra 4.5 free days a year. Find out how
    • facebook
    • twitter
    • linkedin
    • mail
    • whatsapp
    • Have you ever thought what you would do if you had an extra four-and-a-half free days a year? It could be the ideal length of time for that romantic weekend away you’ve been planning for months. 112 hours that could be enough to finish off the old motor you are restoring. Or 6,720 minutes doing nothing at all but enjoying a long walk, lying on the sofa or simply spending time with your loved ones.

      It was with this in mind that over 20,000 people took part in a walk-through, on 31 May 2015, of the 4.6km Legacy Way tunnel in the Australian city of Brisbane. Each participant emerged at the surface with a remittance stub to the value of four-and-a-half extra free days per year. They had just walked through, on the day of its inauguration, a time tunnel – now used by 20,000 drivers a day and which has turned the Queensland capital into a more sustainable, cleaner and quieter city.

    • Have you ever thought what you would do if you had an extra four-and-a-half free days a year?

  • ACCIONA led the Transcity consortium that built the tunnel, alongside Australia’s BMD Constructions and Italy’s Ghella. Together, they overcame several previously unimaginable challenges to complete the underground infrastructure and hand it over to Brisbane’s residents. So, what went into this colossal task?

    The design was no simple matter. Brisbane is a vibrant capital of eastern Australia, which has seen population grow by one million people in the past 15 years alone – from 3.5 to 4.5 million. To reduce congestion, the local government concluded in 2008 that the best option, considering the future growth of the city, would be to bury part of the traffic. Thus a 4.6km tunnel was conceived to join the Western Freeway and Inner City Bypass roads west of the city center.

  • Maximum result with minimum impact

    In April 2011, ACCIONA began the work that, during the next four years, would give a new meaning to quality of life in Brisbane… with a minimum impact on the local environment. The Botanic Gardens, Toowong cemetery – a listed artistic heritage site – parks, neighborhoods, leisure areas and Brisbane Grammar School were just some of the important facilities to benefit from landscaping during the project.

    To ensure the best possible coexistence with the environment during the four-year construction period, a series of additional measures were taken. First, an acoustic shed was built to reduce the noise generated during the excavation works. Then a 500m-long conveyor belt was installed to evacuate the spill from the drilling, avoiding the need for over 180,000 lorry journeys to transport the rubble to a nearby quarry.

    This avoided the emission of over 1,000 metric tons of carbon dioxide to the atmosphere. Noise pollution, as well as the impact of dust on local vegetation, was thus drastically reduced. The solution won the project the Lord Mayor’s Innovation Award in 2012.

  • Detail of the TBM used in the construction of the Legacy Way tunnel
  • Joyce and Annabell: toe to toe underground

    Two giants were meanwhile hard at work below the surface. With diameters of 12.4 meters – the height of a four-story building – and lengths of 100 meters – equivalent to nine buses lined up one after the other – and each weighing 2,800 metric tons – 23 blue whales – the tunnel boring machines, Joyce and Annabell, drilled through the earth in both directions at an average rate of 746 meters per month, setting a one-day record in the process of 49.7 meters.

     

    Working underground to the benefit of those above

    The benefits for the population were immediate. As soon as the tunnel opened to traffic on 25 June 2015, the congestion above ground was immediately relieved on a large scale. Savings are in the order of 14 minutes per journey and a new green and peaceful new district has emerged in the city. Brisbane’s residents are also already enjoying their four-and-a-half days extra free time per year. The result is a sustainable environment in which to face the challenges of a future full of promise.

    Visit the ACCIONA website to get to know more projects like the Legacy Way.

  • Have you enjoyed the article? Share it!

    • facebook
    • twitter
    • linkedin
    • mail
    • whatsapp
    • Kugira, the giant artisan

      • Transport
    • The machine that even Jules Verne was unable to imagine

      • Transport
    • ACCIONA is a leader in providing sustainable solutions for infrastructure and renewable energy projects across the world.

        • Renewable energy
        • Transport
        • Water
        • Social
        • Cities
        • Sustainability
        • Innovation
      • ACCIONA Experience
        • Legal Note
        • Cookies Policy
        • Privacy Policy
        • Contact
        • Ethical Channel
        © Copyright ACCIONA Experience 2025
    • Do you like our stories? Subscribe!

      You must provide a contact email

      YOU’RE JUST ONE STEP AWAY!
      Please, confirm your subscription on the email we have sent you and your registration will be completed.

      An error has ocurred while attempting to register your e-mail. Try to register again later.

      YOU ARE NOW SUBSCRIBED TO THE NEWSLETTER! If you've missed our content, try checking your spam folder and add us to your address book so you can enjoy it without any problems.

Information on data protection

In compliance with Regulation (EU) 2016/679 on Data Protection and with other Data Protection regulations in force, you are hereby informed that your personal data shall be processed by Acciona, S.A. (hereinafter “ACCIONA”), whose identification data are as follows: Tax ID No. (NIF): A08001851; Address: Avenida de la Gran Vía de Hortaleza, 3, 28033 (Madrid); Tel. No.: +34 91 663 28 50; email: protecciondedatos@acciona.com. Your data shall be processed in order to send you information, through the subscription to our Newsletter through electronic means, regarding our latest technological innovation of ACCIONA´s initiative "EXPERIENCE".

The consent given by the data subject by indicating that they have read and accept this data protection information comprises the lawfulness of processing. The data provide is your email address. If you fails to provide the required data, the subscription Request cannot be satisfied. We may also process your satisfaction or preferences, if you voluntarily respond to surveys. Data shall be stored until the elimination is requested.

In order to carry out our purpose, we may give access to your data to service providers (such as technology service providers) who assist us in fulfilling this purpose. Some of its service providers, may be located outside of the European Economic Area in territories that do not offer a level of data protection that is comparable to that of the European Union. In such cases, we transfer User data with appropriate safeguards and always ensuring the security of the same.

The data subject can exercise their rights of access to or rectification, erasure or portability of their data, and/or the restriction of or objection to the processing of such data, by contacting Acciona, S.A. by writing the Department of Data Protection located at Avenida de la Gran Vía de Hortaleza, 3, 28033 (Madrid) or by sending the form available in the link:

FORM

If we consider it necessary in order to be able to identify you, we may ask you for a copy of an identity document. Furthermore, at any time the data subject may withdraw the granted consent by contacting the aforementioned address and file a claim to the Supervisory Authority (Agencia Española de Protección de Datos www.aepd.es). You can also unsubscribe from the Newsletter communication.

For any further information you can visit the Privacy Police on the website https://experience.acciona.com/privacy-policy/.